Skip to content

Audit Readiness Checklist

Pre-examination preparation checklist for regulatory examinations.


Overview

Use this checklist to prepare for FINRA, SEC, OCC, or internal audit examinations of AI agent governance. Complete all applicable items before scheduled examinations.


Pre-Examination Timeline

Timeframe Activities
30 days before Confirm scope, assign response team, inventory documentation
14 days before Compile evidence packs, verify access to systems
7 days before Final documentation review, brief stakeholders
Day of Ensure key personnel available, prepare demonstration environments

Documentation Checklist

Governance Framework Documentation

  • Current governance framework version documented
  • Governance committee charter on file
  • Committee meeting minutes available (past 12 months)
  • Roles and responsibilities documented (RACI matrix)
  • Zone classification criteria documented

Agent Inventory

  • Complete agent inventory current (Control 3.1)
  • All agents classified by zone
  • Agent owners identified and current
  • Business justification on file for each Zone 2-3 agent
  • Approval records available for Zone 2-3 agents

Policy Documentation

  • DLP policies documented (Control 1.5)
  • Environment group configurations documented
  • Sharing and channel rules documented
  • Change management procedures documented (Control 2.3)
  • Incident response procedures documented

Technical Evidence Checklist

Audit Logs

  • Audit log retention verified (Control 1.7)
  • Zone 2: 1-year retention confirmed
  • Zone 3: 10-year retention confirmed
  • Sample audit log exports tested
  • eDiscovery search capability verified (Control 1.19)
  • Audit log export procedures documented

Access Controls

  • Admin role assignments documented (Control 1.18)
  • Segregation of duties verified (Control 2.8)
  • Conditional Access policies documented (Control 1.11)
  • Access review records available (Control 4.2)

Security Controls

  • DLP policy effectiveness report available
  • Runtime protection status documented (Control 1.8)
  • Encryption configuration documented (Control 1.15)
  • MFA configuration documented (Control 1.11)

Operational Evidence Checklist

Change Management

  • Change request records available (past 12 months)
  • Deployment pipeline logs available
  • Rollback incidents documented
  • Change approval records available

Testing and Validation

  • Test plans and results on file (Control 2.5)
  • Bias testing results documented (Control 2.11)
  • Security testing results documented
  • Model validation records (Control 2.6)

Monitoring and Reporting

  • Usage analytics reports available (Control 3.2)
  • Compliance reports generated (Control 3.3)
  • PPAC security posture assessments (Control 3.7)
  • Incident reports on file (Control 3.4)

Personnel Preparation

Key Personnel Availability

  • AI Governance Lead available during examination
  • Compliance Officer available
  • Power Platform Admin available for technical questions
  • CISO available for security questions
  • Legal counsel on standby

Personnel Briefing

  • Examination scope communicated to response team
  • Roles during examination assigned
  • Single point of contact designated
  • Escalation procedures reviewed

System Access Preparation

Demo Environment

  • Representative agent available for demonstration
  • Test accounts configured for examiner use (if needed)
  • Demo data sanitized of actual customer information
  • Network access arranged (guest Wi-Fi, etc.)

Admin Portal Access

  • PPAC access verified for demonstration
  • Purview Compliance access verified
  • Microsoft Entra admin access verified
  • SharePoint admin access verified

Common Examiner Requests

Prepare responses for these frequently requested items:

Request Source Preparation
List of all AI agents Control 3.1 Export agent inventory
Agent approval records Governance minutes Compile approval documentation
Audit logs for specific period Control 1.7 Test Purview Audit export
Supervisory procedures Control 2.12 Prepare written procedures
Incident history Control 3.4 Compile incident reports
Training records Control 2.14 Export training completion data
DLP policy documentation Control 1.5 Document current policies
Model validation evidence Control 2.6 Compile validation reports

Post-Examination Follow-up

  • Document all examiner requests and responses
  • Track open items and deadlines
  • Assign remediation owners
  • Schedule follow-up meetings as needed
  • Update governance procedures based on findings


Last Updated: January 2026 FSI Agent Governance Framework v1.2