Control 2.3: Change Management and Release Planning — Verification & Testing

Verification and testing guidance for Control 2.3: Change Management and Release Planning.

Audience: Power Platform Admins, AI Governance Lead, Compliance Officer, internal audit.


Verification Checklist

# Step Expected Result Evidence
1 Pipelines exist for every Zone 2 / Zone 3 agent Pipeline list in PPAC > Deployment > Pipelines includes the agent's solution Screenshot or pac admin pipeline list export
2 Approval gates configured per zone Power Automate flow on OnApprovalStarted (Zone 3) or native publish approval (Zone 2) is On Flow definition export, JSON of approval action
3 Delegated deployment configured on Zone 3 Prod Stage shows "Delegated deployment: On" with service principal identity distinct from any maker PPAC stage screenshot
4 All recent changes documented Each pipeline run in the last 90 days has a matching change record with approver, timestamp, and justification Change-record export joined to deployment run IDs
5 Rollback procedure tested At least one rollback drill completed in the last 90 days for Zone 3 Drill report (see "Rollback Drills" below)
6 Audit trail complete and immutable Pipeline deployment history retained per zone (1y / 6y); WORM or equivalent for Zone 3 Storage policy + sample retrieval
7 Configuration snapshots present Every Zone 2 / Zone 3 agent has a snapshot dated within the last change cycle Source-control listing with hashes
8 Message Center monitoring active Last delta query within 24 hours; relevant messages routed to change intake Delta state file timestamp; intake-queue records
9 Out-of-solution components inventoried Parallel inventory of external knowledge sources, hosted files, tenant-level connector configs Inventory document

Rollback Drills

Rollback is the most often-failed step under examination. Drill at least once per quarter for Zone 3 agents.

Drill scenario template

Field Example
Drill ID DRILL-2026Q2-001
Agent fsi_customer_support_agent
Trigger scenario Customer-impacting incorrect response after deployment of v2.4.0.0
Decision authority AI Governance Lead
Target rollback version v2.3.5.12 (last known-good managed solution)
RTO target 60 minutes (per Control 2.4)
Actual RTO to be filled
Outcome Pass / Fail with notes

Drill steps

  1. Announce the drill to participants (do not include real customers).
  2. Identify the last known-good managed solution version and confirm the artifact is retrievable from your storage location.
  3. Verify the SHA-256 hash of the retrieved artifact against the evidence sidecar produced at export time.
  4. Run the import to a non-production target first; confirm the prior version is restored.
  5. Run the import to production through the pipeline using the documented rollback procedure.
  6. Validate functional behavior matches the prior version.
  7. Record actual elapsed time, any deviations from the runbook, and any gaps in evidence retention.
  8. Open remediation items for any failed step.

Rollback Triggers (Decision Reference)

Trigger Decision Authority Action Timeline
Critical functional failure AI Governance Lead Immediate rollback < 1 hour
Performance degradation Power Platform Admin Assess, then decide < 4 hours
User-reported issues (non-critical) Agent Owner Investigate, then decide < 24 hours
Compliance concern Compliance Officer Hold, assess, decide Immediate hold
Security vulnerability Entra Security Admin Immediate rollback < 1 hour
Regulatory mandate Compliance Officer / CCO Coordinated rollback Per regulator's window

Agent Rollback Decision Matrix

Scenario Decision Authority Max Rollback Time Approval Required
Security vulnerability Entra Security Admin 1 hour Post-rollback notification to CISO
Regulatory violation Compliance Officer 4 hours CCO notification
Customer-impacting error AI Governance Lead 2 hours Post-rollback documentation
Performance degradation Power Platform Admin 4 hours Manager approval
Incorrect responses Designated Supervisor (FINRA 3110) 24 hours AI Governance Lead approval
User complaints (non-critical) Agent Owner 48 hours Standard change process

Immediate Rollback Procedure (< 4 hours)

For critical issues requiring an immediate response. Authorized for the roles listed in the matrix above.

1. Suspend the Agent

  • Open Copilot Studio and select the affected agent
  • Settings > Publish: set status to Draft (unpublishes from production channels)
  • Confirm the suspension is reflected in the agent registry (Control 3.1)
  • Record: time _, operator ___

2. Notify Stakeholders

  • Send notification to: Agent Owner, business stakeholders, IT Operations, Compliance (if scope warrants)
  • Template: "Agent [Name] has been suspended due to [brief reason]. Investigation in progress. ETA for next update: [time]."
  • Record: time _, operator ___

3. Restore the Previous Version

Path A — Solution rollback (preferred when the change was solution-deployed):

  • Retrieve the previous managed solution from artifact storage
  • Verify SHA-256 hash against the evidence sidecar
  • Import to production using the documented rollback pipeline (delegated deployment still applies)
  • Republish the agent

Path B — Configuration restore (when the change was in-place / non-solution):

  • Retrieve the previous configuration snapshot from source control
  • Restore configuration components manually (system prompt, topics, connectors, settings)
  • Validate in a non-production environment first
  • Republish to the production channel

4. Validate the Rollback

  • Test agent behavior matches the prior version's expected behavior
  • Confirm no new issues introduced by the rollback itself
  • Record: time _, operator ___

5. Document and Notify

  • Update the agent registry with the rollback event and version
  • Send stakeholder notification: "Agent [Name] restored to version [X.Y.Z]. Root cause analysis in progress."
  • Open an incident record (link to Control 2.4)
  • Schedule a post-incident review within 5 business days

Planned Rollback (> 4 hours)

For non-urgent rollbacks that follow the standard change process:

  1. Open a rollback change request
  2. Identify the target version from snapshot history
  3. Test the rollback in a non-production environment
  4. Schedule the rollback during an approved change window
  5. Execute through the standard pipeline (with approvals)
  6. Validate using standard test procedures
  7. Document with root cause and lessons learned

Solution Backup Strategy

Zone Backup Frequency Retention Storage
Zone 1 On change 30 days Maker OneDrive or team SharePoint
Zone 2 Before deployment 90 days SharePoint with versioning + Git
Zone 3 Before deployment + daily 6 years (per SEC 17a-4) Immutable storage (WORM-compliant blob, M365 Backup, or equivalent)

Agent Version History Requirements

Maintain version history for regulatory examination and incident investigation.

Zone History Retention Detail Level Storage Location
Zone 1 90 days Summary Agent registry
Zone 2 1 year Standard SharePoint + Git
Zone 3 6 years (SEC 17a-4) Comprehensive Immutable storage

Version History Record Schema

Field Description Required
Version Number 4-part semantic version (Major.Minor.Build.Revision) Yes
Effective Date When the version went live in the target environment Yes
Change Summary Brief description of what changed Yes
Change Category Prompt / Topic / Knowledge / Connector / Action / Setting Yes
Change Request ID Link to change record Zone 2-3
Approved By Approver name and timestamp Zone 2-3
Snapshot Reference Link to configuration snapshot with hash Zone 2-3
Test Results Link to test evidence (Control 2.5) Zone 2-3
Pipeline Run ID PPAC deployment run identifier Zone 2-3
Rollback Status Never / Rolled back on [date] with reason Yes

Pre / During / Post Change Checklists

Before any change

  • Current version documented in agent registry
  • Configuration snapshot captured and committed to source control with hash
  • Rollback plan documented (target version, runbook reference)
  • Change request approved per zone matrix
  • Solution Checker run (Zone 2-3); critical and high findings addressed

During the change

  • Changes made in the development environment only
  • Testing completed per zone (Control 2.5)
  • New version number assigned per the convention
  • Pipeline run initiated; approval gates satisfied
  • Delegated-deployment identity used on Zone 3 Prod

After the change

  • Production deployment verified (functional smoke test)
  • Version history updated
  • Stakeholders notified
  • Monitoring in place (24-hour heightened observation for Zone 3)
  • Post-deployment validation completed (24-48 hours)
  • Change record closed

Rollback readiness (continuous)

  • Previous snapshot accessible
  • Rollback procedure current (reviewed quarterly)
  • Rollback authority contacts current
  • Communication templates current

A/B Testing for Zone 3 Agent Updates

For Zone 3 agents or significant changes, A/B testing reduces blast radius. Where the platform supports traffic splitting, configure metrics that correspond to FSI risk indicators (regulator-relevant errors, supervisor-flagged responses, escalation rates).

# A/B test configuration template
ab_testing:
  enabled: true
  test_duration_days: 7
  traffic_split:
    control: 80%    # Current production version
    treatment: 20%  # New version
  success_metrics:
    - metric: resolution_rate
      maximum_degradation_percent: 5
    - metric: csat_score
      maximum_degradation_points: 0.2
    - metric: error_rate
      maximum_degradation_percent: 2
    - metric: supervisor_flagged_rate
      maximum_degradation_percent: 0   # No tolerance for increase
  auto_rollback_triggers:
    - condition: "error_rate > control_error_rate + 5%"
      action: immediate_rollback
    - condition: "supervisor_flagged_rate > control + 0%"
      action: pause_and_review
  graduation_criteria:
    - All success metrics met
    - No critical errors
    - Stakeholder sign-off
    - Compliance Officer review of supervisor-flagged sample

FSI note: For agents in regulated workflows (broker-dealer supervision, lending decisioning, AML triage), confirm with Compliance that A/B testing on production traffic is permissible under your supervisory framework. Some firms require a synthetic-traffic shadow deployment instead.


Documentation Requirements

Change Record Contents

Field Description Required
Change ID Unique identifier (ties to ticketing system) Yes
Description What is being changed Yes
Justification Why the change is needed Yes
Risk assessment Potential impact (model risk if applicable) Zone 2-3
Test results Validation evidence (Control 2.5) Zone 2-3
Approvals Who approved with timestamps Yes
Pipeline run ID PPAC deployment run identifier Zone 2-3
Deployment date When deployed Yes
Validation Post-deployment confirmation outcome Yes
Rollback status Whether rolled back, when, and why Yes

Audit Trail

Maintain records for:

  • Change requests and approvals
  • Pipeline deployment runs (PPAC export)
  • Power Automate approval flow runs (export from Power Automate run history)
  • Delegated-deployment service-principal sign-in events (Entra audit logs)
  • Test results (Control 2.5)
  • Rollback events
  • Post-deployment validation
  • Message Center events that drove changes

Evidence Package for Audit

When audit or examination requests evidence of Control 2.3 effectiveness, prepare:

  1. Pipeline configuration export — list of pipelines, stages, target environments, delegated-deployment identities
  2. Approval flow definition — JSON export of the Power Automate flow on OnApprovalStarted
  3. Sample of deployment runs (typically 25 random runs from the audit period) with linked change records, approvals, and post-deployment validation
  4. Rollback drill reports — at least the most recent quarter's drill
  5. Configuration snapshots for sampled agents with SHA-256 hashes
  6. Audit log extracts showing service-principal identity executing Prod deployments
  7. Message Center triage log showing platform-change events routed into change intake
  8. Retention policy documentation for change records